Pros: Rent stabilized, laundry in building, good noise insulation Cons: Management is constantly delinquent on ConEd bills, inadequate heat in the winter, some rat problems.
50 GREENE AVENUE is a mid-century 1932 building, 7 floors, 41 units in Prospect Heights, NYC. Owned by OTA VANDERBILT LLC. Public records show 450 open violations, 265 311 complaints, 12 active litigation matters on file. Rent stabilization on file covers 39 units (registered 2024). Lucid Rents has 3 verified tenant reviews on this building.
Drop this scorecard into a tenant guide, blog post, or wiki. It updates itself as new violations are filed.
Brooklyn · March 2026
Best & worst months to sign a lease
Potential savings: ~14% by timing your move to March.
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
Monthly counts over the last 7 years · all data sources
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM LEADING FROM BUILDING ENTRANCE DOOR AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4F, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WINDOW RECESS AT NORTH IN THE 1st ROOM FROM EAST LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION FAN AT CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
Pros: Rent stabilized, laundry in building, good noise insulation Cons: Management is constantly delinquent on ConEd bills, inadequate heat in the winter, some rat problems.
Unit 1c Pros: Nice neighbors, quiet building Cons: Heating does not work Advice to landlord: Fix heat
Pros: Location is great, unit is renovated, good space for rent cost, friendly neighbors, skyline views Cons: Everything about the management company is horrible. All the 6th floor units leak because of an old work tha…
Portfolio-level grade reflects the landlord's buildings across NYC, weighted by unit count. Individual building grades may differ.
View full landlord profileTop 2 by score · of 3 total
ACRIS deeds and regulatory filings
UNSANITARY CONDITION — PESTS
HPD Class B Violation — § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEV
HPD Class B Violation — § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MON
HPD Class B Violation — § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM LEADING FROM BUILDING ENTRANCE DOOR AT
HPD Class B Violation — § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MON
HPD Class B Violation — § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WINDOW RECESS AT NO
HPD Class B Violation — § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BUZZER INTERCOM SYSTEM FROM EAST WALL AT BUILDING ENTR
HPD Class B Violation — § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WINDOW RECESS AT NORTH IN THE
HPD Class B Violation — § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WINDOW RECESS AT NO
HPD Class B Violation — § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION FAN AT CEILING IN THE 1st BATHR