Pros: Good location and cheap Cons: I had a mouse in my apartment and they kept coming back to eat the poison for a couple of months. Parking also not great. Hot water is not consistent in the shower.
345 BAY RIDGE PARKWAY is a mid-century 1929 building, 6 floors, 59 units in Bay Ridge, NYC. Owned by NARROWS MANGEMENT OF BAY RIDGE. Public records show 87 open violations, 65 311 complaints, 2 active litigation matters on file. Lucid Rents has 1 verified tenant review on this building.
Brooklyn · March 2026
Best & worst months to sign a lease
Potential savings: ~16% by timing your move to October.
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
Monthly counts over the last 7 years · all data sources
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 1st STORY
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT BUILDING VESTIBULE DOOR AT PUBLIC HALL, 1st STORY
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER SASH WINDOW. 2ND WINDOW AT NORTH IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 5F, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Pros: Good location and cheap Cons: I had a mouse in my apartment and they kept coming back to eat the poison for a couple of months. Parking also not great. Hot water is not consistent in the shower.
Portfolio-level grade reflects the landlord's buildings across NYC, weighted by unit count. Individual building grades may differ.
View full landlord profileTop 1 by score · of 2 total
ACRIS deeds and regulatory filings
HEAT/HOT WATER — ENTIRE BUILDING
HEAT/HOT WATER — ENTIRE BUILDING
HEAT/HOT WATER — ENTIRE BUILDING
HEAT/HOT WATER — ENTIRE BUILDING
HEAT/HOT WATER — ENTIRE BUILDING
HEAT/HOT WATER — ENTIRE BUILDING
HEAT/HOT WATER — ENTIRE BUILDING
HEAT/HOT WATER — ENTIRE BUILDING
HEAT/HOT WATER — ENTIRE BUILDING
HPD Class A Violation — § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 1st STO