10 total
FILING TO OBTAIN CERTIFICATE OF COMPLIANCE FOR ONE (1) PACKAGED ROOFTOP HVAC UNIT PREVIOUSLY FILED UNDER DOB APPLICATION No. 510036382. INSTALL NEW EXHAUST VENT FOR REPLACEMENT HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
LEGALIZE ONE (1) EXISTING 12-TON SPLIT HEAT PUMP SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
REPLACE GAS-FIRED BOILER WITH GAS-FIRED HOT WATER HEATER AS PER PLANS. CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT HOT WATER HEATER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
AT&T - Relocation and removal of cabinets on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Installation of gas meter and gas piping as per plans. No change to occupancy, use or egress.
Installation of non-emergency gas fired generator with related gas booster pump on existing equipment platform on roof. No change to occupancy, use, or egress.
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLDINSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITHCHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.