5 total
Decommission of existing entire Sprint site. Remove all antennas and equipment from the roof and equipment room on 7th floor. Service connection in basement. Initial installation approved under application #401105200
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK- SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014CODE.
INSTALLATION OF EASY SCALE PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.