7 total
REPAIR THE BUILDING FACADE. REPAIR LINTELS, SILLS, DETERIORATING FACE BRICKS. REPOINTING, ETC. ALL AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALL DIRECT REPLACEMENT HOT WATER HEATER AND REPLACEMENT GAS PIPING AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET.
Dish Network - Installation of new platform with related cabinets on roof. Installation of antenna sectors with RRH units and GPS unit on roof. Related service connection. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
REPLACEMENT OF 9 UNITS ON THE 1ST FLOOR AND OUTSIDE SPACE WITH A TOTAL CAPACITY OF 6 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF DISH NETWORK ANTENNA SITE. INSTALL (3) ANTENNAS WITH RELATED EQUIPMENT, (1) MICROWAVE ANTENNA, (6) RRH UNITS AND INSTALL (2) EQUIPMENT CABINET WITH RELATED EQUIPMENT ON PLATFORM ON ROOF. ALL IN CONFORMANCE WITH TPPN 5/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY.