5 total
Gas piping connection to two new dual fueled (natural gas and #2FO) burners on two newly installed replacement hot water heating boilers. Burner piping connected to existing gas meter, service and piping. No change in use, occupancy or egress.
Replacement of 1 dual fuel hot water heating boiler with new dual fuel hot water heating boiler. No change in use, occupancy or egress.
Installation of chimney liner in existing masonry clay lined chimney
Replacement of 1 dual fuel heating boiler with new oil-fired heating boiler. No change in use, occupancy or egress.
REPAIR TO EXISTING CONCRETE SLABS THAT HAVE BEEN CRACKED AND DAMAGED. INSTALL NEW FLOORING AT LOBBY AREA TO MATCH EXISTING FLOORING.