18 total
INSTALLATION OF TEMPORARY SHORING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
install temporary construction fence.
INSTALLATION OF TEMPORARY BETAMAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of material hoist
Localize Masonry Repairs as shown in filed drawings. No change in Occupancy, Egress or use.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Local Law Cycle 8 Facade Repairs as shown in filed drawings. No Change in use, egress or occupancy
INSTALL STOREFRONT AWNING WITH NON-ILLUMINATED COPY READING BOOBA COLOR BAR 997-A HAIR SALON. COPY NOT TO EXCEED 12 SQ FT TOTAL. NO CHANGE IN USE, EGRESS OR OCCUPANCY
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PL: Installation of New Plumbing Fixtures. No change in Occupancy, Use, or Egress.
OT: Interior Renovation of Store on 1st Floor. No change in occupancy, use, or egress.
INSTALLATION OF TEMPORARY STORAGE OF MATERIALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of 2 new shampoo sinks and install new electric Hot Water Heater in existing commercial space
MINOR PLUMBING WORK. NO CHANGE IN USE OR EGRESS.
INSTALLATION OF PLYWOOD FENCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.