5 total
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE.
RELOCATE PLUMBING FIXTURES WITH NEW (1 WC, 1 LAV, 1 SINK), CAP AND REMOVE (1 TUB), INSTALL NEW PLUMBING FIXTURES AT NEW ROUGHING (1 LAV, 1 WC, 2 SHOWERS, 1 W/M, 1DW) AT APT 3G ON THE 3RD FLOOR
GENERAL CONSTRUCTION TO RENOVATE APT 3G ON THE 3RD FLOOR. WORK WILL INCLUDE NEW PARTITIONS & FINISHES, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
REPLACE BREECHING AND INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.