6 total
Renovation of apts 5M, 5N, 5B, and 5C. Replace existing interior walls and ceilings with new.
REPLACE/REPAIR MASONRY WALL. REMOVE PORTION OF MASONRY PARAPET WALL AND INSTALL RAILING ON TOP OF PARAPET WALL. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Replace Stove, on existing gas piping,gas finish required. Replace kitchen sink, replace lavatory on existing roughing. Relocate tub, and toilet in same bathroom. Existing gas meter in cellar to remain. work filed in conjunction with Job # 123868341.
Replace Stove, on existing gas piping,gas finish required. Replace kitchen sink, replace lavatory on existing roughing. Relocate tub, and toilet in same bathroom. Existing gas meter in cellar to remain. work filed in conjunction with Job # 123868341.