Manhattan · March 2026
Best & worst months to sign a lease
Potential savings: ~9% by timing your move to April.
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
Monthly counts over the last 7 years · all data sources
No HPD records on file in the last 7 years.
Portfolio-level grade reflects the landlord's buildings across NYC, weighted by unit count. Individual building grades may differ.
View full landlord profileTop 5 by score · of 257 total
ACRIS deeds and regulatory filings
V*-DOB VIOLATION - DISMISSED — VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
V*-DOB VIOLATION - DISMISSED — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
V*-DOB VIOLATION - DISMISSED — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
V*-DOB VIOLATION - DISMISSED — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
V*-DOB VIOLATION - DISMISSED — EMERGENCY WORK ORDER DUE DEFECTIVE CAVITY WALL AT EXPOSURES #1 AND #3. REMEDY: REPAIR THE SIDEWALK SHED AND
V*-DOB VIOLATION - DISMISSED — CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS
V*-DOB VIOLATION - DISMISSED — CYCLE 9A UNSAFE REPORT FILED
V*-DOB VIOLATION - DISMISSED — FTM FACADE AND APPURTENANCES ON 5/17/2021 CAVITY WALL PARTIALLY COLLASPED FOR REASONS YET TO BE DETERMIN
V*-DOB VIOLATION - DISMISSED — EMERGENCY WORK ORDER. DUE TO THE PARTIAL COLLAPSE OF THE CAVITY WALL ON EAST ELEVATION EXPOSURE #3. REMEDY: T
V*-DOB VIOLATION - DISMISSED — AT TIME OF INSPECTION OBSERVED A SECTION OF BRICK FACADE APPROXIMATELY 6'X8' DISLODGED FROM BUILDING AND FELL