5 total
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
General Maintenance of masonry facade. Work includes lintel replacement, repointing, crack repair and masonry replacement.
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Installation of plumbign fixtures as per plans.
Enlargement of existing eating and drinking establishment into adjacent store at first floor as per plans and Mechanical work to be done. No change of use, egress or occupancy under this application.