17 total
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO MAINTAIN: PORTION OF THE CELLAR SLAB COLLAPSED IN THE N/E WING OF BUILDING. INSPECTED REVEALED FURTHER DETERIORATION OF THE SLAB IN 7 AREAS OF THE CELLAR SLAB.REMEDY: OWNER IS TO HIRE LICENSED NYS PE TO PERFORM FULL INSPECTION OF CELLAR AND SUBCELLAR OF N/E PORTION OF BUILDING.REPORT SUBMISSION,PLANS,PERMITS & REPAIR TO START BY 11/20/14
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION