Drop this scorecard into a tenant guide, blog post, or wiki. It updates itself as new violations are filed.
Manhattan · March 2026
Best & worst months to sign a lease
Potential savings: ~16% by timing your move to November.
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
Monthly counts over the last 7 years · all data sources
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BULKHEAD DOOR LOCKSET AT PUBLIC HALL STAIRS, 5th STORY
§ 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.
§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR SWEEP IN THE ENTRANCE LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Portfolio-level grade reflects the landlord's buildings across NYC, weighted by unit count. Individual building grades may differ.
View full landlord profileTop 2 by score · of 3 total
ACRIS deeds and regulatory filings
PAINT/PLASTER — CEILING
WATER LEAK — HEAVY FLOW
PLUMBING — BASIN/SINK
UNSANITARY CONDITION — SEWAGE
HEAT/HOT WATER — ENTIRE BUILDING
HEAT/HOT WATER — ENTIRE BUILDING
HEAT/HOT WATER — APARTMENT ONLY
PLUMBING — BASIN/SINK
PLUMBING — BASIN/SINK
PAINT/PLASTER — WALL