15 total
interior renovation of unit 5A plumbing work type
Interior renovation of unit 5A on 5th Floor. The demolition and construction of misc. non-bearing partitions, installation of gyp. bd. soffits and drop clg.electrical, lighting and switching as per plan, fittings and finishes as per plan. PL sep.
interior renovation plumbing work type, replacement of six (6) plumbing fixtures, installation of new washing machine and electric dryer. no gas work under this application . No change in egress, occupancy or use.
Interior renovation of unit 3C on 3rd floor. The demolition and construction of misc. non-bearing partitions, installation of gypsum board soffits and drop ceilings, electrical, lighting and switching as per plan fittings and finishes as per plan.
APARTMENT RENOVATION ON THE 005 FLOOR 5B UNIT. plumbing work in conjunction with ot
APARTMENT RENOVATION ON THE 005 FLOOR 5B UNIT. construction work in conjunction with pl # M00816499-I1 and mh #M00816498-I1 under separate applications
APARTMENT RENOVATION ON THE 005 FLOOR 5B UNIT.REPLACEMENT OF EXISTING HVAC SYSTEM.
PLUMBING WORK FILED IN CONJUCTION WITH OT; NO CHANGE IN USE GROUP, EGRESS OR OCCUPANCY.
MINOR RELOCATION OF NON-LOAD BEARING PARTITIONS; ENLARGE EXISTING PRIMARY BATH INTO EXISTING LAUNDRY AREA; NEW POWDER ROOM AT FORMER CLOSET; RECONFIGURE EXISTING BATH 1 FOR ADA CLEARANCE; NO CHANGE IN USE GROUP, EGRESS OR OCCUPANCY.
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF 500# CAPACITY MATERIAL ONLY HOIST DURING BLDG ALTERATION, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESSUNDER THIS APPLICATION.
STORAGE OF MATERIAL / EQUIPMENT ON TOP OF HEAVY DUTY SIDEWALK SHED. STORAGE SHALL NOT EXCEED 50 PSF. SHED FILED UNDER SEPARATE APPLICATION. STORAGE SHALL COMPLY WITH CH#33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
MECHANICAL WORK FILED IN THE APT. 11B AS PER PLANS HEREWITH.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.