10 total
Sprinkler work on the 2nd floor (ARCS room) as indicated on drawings.
Construction work on the 2nd floor (ARCS room) as indicated on drawings.
EXISTING GAS RANGE TO BE REPLACED AT CURRENT LOCATION , NO CHANGE OF USE, EGRESS OR OCCUPANCY
proposed interior renovation of existing commercial fitout at ground floor level of existing 35 story mixed use (residential/commercial) building.No change in use , egress or occupancy.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DUE TO AN EMERGENCY FACADE CONDITION PER ENGINEER'S LETTER DATED 01-14-2022. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Facade restoration. No change in egress, use or occupancy.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of system scaffold stair tower per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.