6 total
Install washers and dryers in cellar for occupants use. No change in use, occupancy or egress.
install washers and dryers for occupant use. No change in use, occupancy or egress
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 10 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B.
Install gas ranges and gas meters for 60 apartments as per plan. no change of use, egress or occupancy under this application.
Install new gas piping for gas ranges in 60 apartments as per plan, plumbing application is filed separately. No change of use, egress or occupancy.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.