10 total
Filing herewith for the Early Learn Lease Renewal Evaluation of the existing work which includes minor repairs and renovations. There will be no change in egress, occupancy or use.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Filing herewith for the related plumbing work in kitchen which includes disconnecting and reconnecting plumbing fixtures to perform repair/ maintenance to walls. Add drinking fountain, water cooler and sump pump. No change to egress, use or occupancy.
Modification to Verizon site. Install 3 antennas, install 1 GPS antenna, replace 2 RRH units, install 7 RRH units, remove 1 cabinet and install new platform with related dunnage.
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 2970 WEST 27TH STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
MASONRY RESTORATION, WATERPROOFING INSTALLATION, WINDOW SILL REPLACEMENT, MASONRY REPAIR ANDCONCRETE REPAIR AT EXTERIOR ENVELOPE AT ALL BUILDING ELEVATIONS.
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE REPAIR WORK AT 2970 WEST 27TH STREET, BROOKLYN
INSTALLATION OF NEW SIDEWALK SHED AT 2970 WEST 27TH STREET, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Mod. of existing VERIZON site. Install 1 sector (3 antennas), install 4 additional antennas, replace 2 antennas, install 7 RRH units, and replace 1 equipment cabinet on roof. All in conformance with TPPN 5/98. No change in use, egress or occupancy.