2 total
REPAIR FACE BRICK REAPPOINTING & STUCCO REPAIR AT FRONT ELEVATION APROX.200 SF AND BRICK LINTEL REPAIR APROX. 10# AS PER PLAN
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.