Bronx · February 2026
Best & worst months to sign a lease
Potential savings: ~10% by timing your move to August.
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
Monthly counts over the last 7 years · all data sources
No HPD records on file in the last 7 years.
Portfolio-level grade reflects the landlord's buildings across NYC, weighted by unit count. Individual building grades may differ.
View full landlord profileTop 1 by score · of 2 total
ACRIS deeds and regulatory filings
V*-DOB VIOLATION - DISMISSED — FACADE ELEMENT FAILURE(EIFS).FAILURE TO MAINTAIN FACADE&APPURTENANCES ON 3/2/23 LARGE SECT.OF EIFS SEPARATED F
V*-DOB VIOLATION - DISMISSED — FAILURE TO MAINTAINE BUILDING WITH NO IMMEDIATE REMEDY TO THE REMAINING SECTIONS IN WHICH LARGE PCS FE
V*-DOB VIOLATION - DISMISSED — PARTIAL STOP WORK ORDER FAILURE TO MAINTAIN BUILDING LARGE PIECES OF STYROFOAM CONTINUE TO FALL FROM BUILDING
V-DOB VIOLATION - ACTIVE — INSTALL APPROXIMATELY 320LINEAR FEET OF SIDEWALK SHED ON ALL 4EXPOSURE TO SAFEGUARD THE PUBLIC AND PROPERTY
V*-DOB VIOLATION - DISMISSED — FAILURE TO MAINTAIN FACADE&APPURT.ON 03-02-23 A12'WIDTH.X25'HEIGHT SECT.OF DECORATIVE STYRO FOAM(EFIS)HAD D
V-DOB VIOLATION - ACTIVE — PREMISES RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED AT 12'W X 25'H SECTION OF DECRATIVE STYROFO
V-DOB VIOLATION - ACTIVE — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED A 12'W X 25'H SECTIO
V-DOB VIOLATION - ACTIVE — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
V*-DOB VIOLATION - DISMISSED — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
V*-DOB VIOLATION - DISMISSED — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4