4 total
LINTEL REPLACEMENT, BRICK REPLACEMENT AND REPOINTING OF THE TWO STREET FACING FACADES WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY.
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
REPLACE BOILER AND REINSTALL EXISTING BURNER.