13 total
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO MAINTAIN.ALL STAIRCASES WERE IN STATE OF DISREPAIR,RUSTED & DETACHING THREADS AND RIZERS.UNEVEN STEPS BROKEN AND LOOSE STONE@ THREADS.OWNR TO ENGAGE PE&CNTRCTR TO EVAL ALL 3/18/26 COMPLETE BY 4/1/26
EMERGENCY WORK.THE METAL PAN STAIRS THREADS HAVE RUSTED &DETACHD FRM THE STAIR STRINGERS@NORTH WING.THE CONDITION IS NOT RELATED TO FIRE DAMAGES.IMMED REINFORCE/RE-SUPPORT ALLL STAIR THREADS RISEPS AFFECTED UNDR DRCT&CONTINUOUS SPRVSN OF PE SBMT M&M BY EOD 2/27/26
EMERGENCY WORK ORDER.THE BULKHEAD WALL@SOUTH WING STAIRCASE@FRNT WALL IS IN SEVERE STATE OF DISREPAIR.THE WALL IS BULGNG&LEANING OUTWARD &AT RISK OF COLLAPSE.IMMED BRACE/STBZLE THE BULKHD WALL UNDR DRCT& CNTINUOUS SPRVSN OF PE.PE TO SBMT MEANS&METHDS BY EOD BY 2/27/26
FAILURE TO MAINTAIN.THE EXTERIOR MASONRY WALLS ARE IN STATE OF DISREPAIR.BULKHEAD WALL BULGNG&LEANING.PARAPET BULGNG,CRACKED AND LEANING.RUSTED LINTELS&CRCKD BRCK IN MANY LOCATIONS.ENGAGE NYS LICENSD PE&CNTRCTR TO EVAL ENT FACADE&REPAIR UNDR PERMIT.OBTAIN PERMIT BY 3/25/26.COMPLETE BY 5/1/26