Violations · 172
DateClassDescriptionStatus
6/4/2026Class A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE 1st ROOM FROM NORTH LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH · Apt 5DNOV SENT OUT
6/4/2026Class B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH · Apt 5DNOV SENT OUT
6/4/2026Class B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH · Apt 5DNOV SENT OUT
6/4/2026Class B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH · Apt 5DNOV SENT OUT
6/4/2026Class A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH · Apt 5DNOV SENT OUT
5/30/2026Class C567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, GAPS OR CRACKS IN WALLS, CEILINGS, FLOORS, FIXING LEAKS AND MANAGING GARBAGE IN PUBLIC AREAS. EVIDENCE FOUND AT IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH · Apt 2BCIV14 MAILED
5/30/2026Class B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH · Apt 2BCIV14 MAILED
12/26/2025Class B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5D, 6th STORY, 1st APARTMENT FROM NORTH AT EAST · Apt 5DVIOLATION DISMISSED
Litigations · 24
OpenedCase typeRespondentStatus
12/11/2025Heat and Hot WaterDAVID KULE,MICHAEL LAUB,W 148 LLCPENDING
1/27/2025Heat and Hot WaterDAVID KULE,MICHAEL LAUB,W 148 LLCCLOSED
4/26/2024Tenant ActionW 148 LLC REALTY GROUP NORTHCLOSED
12/19/2023Tenant ActionW 148 LLCCLOSED
12/6/2023Tenant ActionWEST 148 LLCCLOSED
12/1/2023Heat and Hot WaterDAVID KULE,MICHAEL LAUB,W 148 LLCCLOSED
8/29/2023Tenant Action/HarrassmentW 148 LLCCLOSED
4/5/2023Heat and Hot WaterDAVID KULE,MICHAEL LAUB,W 148 LLCCLOSED