Violations · 64
DateClassDescriptionStatus
4/29/2026Class A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.NOV SENT OUT
6/4/2025Class A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.NOV SENT OUT
2/25/2025Class C§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDING THE MAXIMUM OF 130F DEGREES AT FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH · Apt 3VIOLATION DISMISSED
2/25/2025Class C§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF AIR CONDITIONER INSTALLED AT FIRE ESCAPE WINDOW THAT IS IMPEDING EGRESS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH · Apt 3VIOLATION DISMISSED
8/20/2024Class B§ 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH · Apt 3VIOLATION CLOSED
8/20/2024Class B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE FOYER LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH · Apt 3VIOLATION CLOSED
8/20/2024Class C§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 0; LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH · Apt 3VIOLATION CLOSED
8/20/2024Class B§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH · Apt 3VIOLATION CLOSED
Litigations · 2
OpenedCase typeRespondentStatus
11/21/2018Heat and Hot WaterERICK GONZALEZ,WILMINGTON SAVINGS FUND SOCIETYCLOSED
7/11/2013Tenant ActionELY MAHOR,LINK POINT REALTYCLOSED