Violations · 107
DateClassDescriptionStatus
5/4/2026Class A§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQURE FEET AT CEILING IN THE BATHROOM LOCATED AT APT 2D, 4th STORY, 7th APARTMENT FROM EAST AT SOUTH · Apt 2DNOTICE OF ISSUANCE SENT TO TENANT
5/4/2026Class B§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 2D, 4th STORY, 7th APARTMENT FROM EAST AT SOUTH · Apt 2DNOV SENT OUT
5/4/2026Class B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 2D, 4th STORY, 7th APARTMENT FROM EAST AT SOUTH · Apt 2DNOV SENT OUT
4/29/2026Class A§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMATION/REQUIRED-SIGNAGE.PAGENOV SENT OUT
4/16/2026Class B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM AT NORTH WALL IN THE BATHROOM LOCATED AT APT 4K, 4th STORY, 7th APARTMENT FROM WEST AT NORTH · Apt 4KNOV SENT OUT
4/16/2026Class A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 3N, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH · Apt 3NNOV SENT OUT
4/16/2026Class B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT EAST WALL IN THE BATHROOM LOCATED AT APT 4K, 4th STORY, 7th APARTMENT FROM WEST AT NORTH · Apt 4KNOV SENT OUT
4/16/2026Class B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 4K, 4th STORY, 7th APARTMENT FROM WEST AT NORTH · Apt 4KNOV SENT OUT
Litigations · 6
OpenedCase typeRespondentStatus
7/1/2025Tenant ActionCOMMUNITY ACCESSPENDING
10/11/2019Tenant Action/Harrassment910 DE KALB AVE LPCLOSED
8/8/2019Tenant Action910 DE KALB AVENUE LP,COMMUNITY ACCESS INCORPORATEDCLOSED
12/31/2014Tenant ActionCOMMUMITY ACCESS INCORPORATEDCLOSED
5/30/2013Tenant ActionCOMMUNITY ACCESS INCORPORATEDCLOSED
1/18/2006Tenant Action910 DEKALB AVENUE LP,910 DEKALB AVENUE LPCLOSED