Violations · 196
DateClassDescriptionStatus
5/5/2026Class A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.NOV SENT OUT
4/30/2026Class A§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMATION/REQUIRED-SIGNAGE.PAGEVIOLATION OPEN
2/21/2026Class C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT PUBLIC HALL 1ST STORY AT BOILER ROOM, 1st STORYNOV SENT OUT
2/21/2026Class C§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 6, 4th STORY, 1st APARTMENT FROM NORTH AT EAST · Apt 6NOV SENT OUT
2/18/2026Class C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE FRAME IN THE ENTRANCE LOCATED AT APT 6, 4th STORY, 1st APARTMENT FROM NORTH AT EAST · Apt 6NOV SENT OUT
2/18/2026Class C§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 6, 4th STORY, 1st APARTMENT FROM NORTH AT EAST · Apt 6NOV SENT OUT
2/18/2026Class C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT PUBLIC HALL AT BOILER ROOM, 1st STORYNOV SENT OUT
1/23/2026Class A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND SKYLIGHT OPENING AT PUBLIC HALL, 4th STORYNOV SENT OUT