Violations · 248
DateClassDescriptionStatus
3/12/2026Class A§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL AND AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM SOUTH AT WEST · Apt 2BNOV SENT OUT
3/12/2026Class A§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM SOUTH AT WEST · Apt 2BNOV SENT OUT
3/12/2026Class C§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SHUT-OFF VALVE AT RADIATOR AT NORTH IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM SOUTH AT WEST · Apt 2BNOV SENT OUT
3/12/2026Class A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE PRIVATE HALLWAY , THE 1st ROOM FROM NORTH AT WEST, THE 1st ROOM FROM NORTH AT EAST, THE FOYER , THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM SOUTH AT WEST · Apt 2BNOV SENT OUT
3/12/2026Class A§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL AND AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM SOUTH AT WEST · Apt 2BNOV SENT OUT
3/12/2026Class C§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM SOUTH AT WEST · Apt 2BNOV SENT OUT
3/12/2026Class B§ 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WATER SUPPLY LINE AT WATER TANK IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM SOUTH AT WEST · Apt 2BNOV SENT OUT
3/12/2026Class A§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE TILED/GROUTED SURFACES AT EAST WALL, SOUTH IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , 1st SECTION FROM SOUTH AT WEST · Apt 2BNOV SENT OUT
Litigations · 8
OpenedCase typeRespondentStatus
6/7/2024Tenant Action590 FIVE CORPORATION,PETER BOUBEAUCLOSED
10/19/2023Tenant Action590 FIVE CORPCLOSED
10/25/2022Tenant ActionPETER BOURBEAUCLOSED
1/7/2019Tenant Action590 FIVE CORPORATIONCLOSED
4/25/2011Tenant Action590 FIVE CORPORATIONCLOSED
4/8/2010Heat and Hot Water590 FIVE CORP,PETER BOURBEAU,THOMAS WEBLERCLOSED
8/10/2006Tenant Action590 FIVE CORPORATION,EWB MANAGEMENTCLOSED
8/15/2005Tenant ActionPWB MANAGEMENTCLOSED