Violations · 78
DateClassDescriptionStatus
11/13/2025Class C567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, GAPS OR CRACKS IN WALLS, CEILINGS, FLOORS, FIXING LEAKS AND MANAGING GARBAGE IN PUBLIC AREAS. EVIDENCE FOUND AT THROUGHOUT YARDVIOLATION DISMISSED
12/17/2022Class A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORYINVALID CERTIFICATION
12/17/2022Class B§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 1st STORYVIOLATION DISMISSED
12/17/2022Class B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING AT PUBLIC HALL, 1st STORYVIOLATION DISMISSED
9/21/2022Class B§ 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 11, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH · Apt 11VIOLATION CLOSED
9/21/2022Class B§ 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 7, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST · Apt 7CERTIFICATION POSTPONMENT DENIED
9/21/2022Class B§ 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 8, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH · Apt 8CERTIFICATION POSTPONMENT DENIED
9/21/2022Class B§ 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 9, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST · Apt 9CERTIFICATION POSTPONMENT DENIED
Litigations · 16
OpenedCase typeRespondentStatus
—Comp Supplemental CasesKATRIEL YANKOVICHCLOSED
3/15/2021Tenant Action/HarrassmentDAVID FRANCZOZ ET AL,GRANDPA LEWIS LLCCLOSED
4/8/2020Tenant ActionNOE CHAIMPENDING
4/1/2019Heat and Hot WaterCHAIM NOE,DAVID FRANCZOZ,GRANDPA LEWIS LLC.CLOSED
2/22/2019Tenant ActionGRANDPA LEWIS LLC,NOE CHAIM ET ALCLOSED
5/30/2013Comp Supplemental CasesKATRIEL YANKOVICHCLOSED
2/27/2013Heat and Hot WaterKATRIEL YANKOWITZCLOSED
5/16/2012Comp Supplemental CasesKATRIEL YANKOVICHCLOSED