Staten Island · February 2026
Best & worst months to sign a lease
Potential savings: ~16% by timing your move to February.
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
Monthly counts over the last 7 years · all data sources
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT EAST WALL IN THE 2nd PRIVATE HALLWAY FROM EAST LOCATED AT APT PRIVAT, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
HPD Class B Violation — § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT EAST WALL IN THE
WATER LEAK — SLOW LEAK
PLUMBING — TOILET
PAINT/PLASTER — WALL
WATER LEAK — DAMP SPOT
PAINT/PLASTER — CEILING
PAINT/PLASTER — WALL