Staten Island · February 2026
Best & worst months to sign a lease
Potential savings: ~10% by timing your move to February.
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
Monthly counts over the last 7 years · all data sources
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT VESTIBULE DOOR AT CELLAR
§ 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE INSIDE COMPACTOR CLOSET AT SOUTH WALL AT PUBLIC HALL, 6th STORY, SECTION ''north''
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCKING ASSEMBLY AT VESTIBULE DOOR AT CELLAR AT PUBLIC HALL
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WEST WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 6P, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH''
§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM
Stapleton is one of Staten Island's most walkable neighborhoods — a revitalized waterfront with new residential development, the historic Paramount Theatre, and a growing restaurant scene on Bay Street. It's the borough's best bet for urban-style living.
Elevator — Elevator - Multiple Devices On Property
Noise - Residential — Banging/Pounding
HEAT/HOT WATER — ENTIRE BUILDING
HEAT/HOT WATER — ENTIRE BUILDING
HEAT/HOT WATER — ENTIRE BUILDING
PLUMBING — WATER SUPPLY
PLUMBING — WATER SUPPLY
HEAT/HOT WATER — ENTIRE BUILDING
HEAT/HOT WATER — ENTIRE BUILDING
PLUMBING — WATER SUPPLY