Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Alpha sector location inspection
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
HEREBY FILING FOR INSTALLATION OF CONCRETE PAD AND REPLACEMENT OF EXISTING CHILLER AND PUMPS WITH SIX (6) NEW MODULAR CHILLERS AND PUMPS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
FILING FOR DIRECT REPLACEMENT OF (8) EIGHT WASHWER MACHINES AND (8) GAS FIRED CLOTHES DRYERS IN EXISTING LAUNDRY ROOM LOCATED IN THE CELLAR OF A NINE STORY, CLASS 'A' MULTIPLE DWELLING
RECONNECT LOW PRESSURE GAS LINE. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS ON (2) EXISTING LP BOILERS. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
NEW 38 X20 7 GAGE 304 STAINLESS STEEL LINER FIRST 60 FEET AND 10 GAGE 304 STAINLESS STEEL NEXT 100 FEET IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
Modification to existing AT&T site. Replace 3 antennas, replace 3 RRH units, install 3 RRH units, and retrofit 1 existing equipment cabinet on roof. All in conformance with TPPN 5/98. No change in use, egress, or occupancy.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
MODIFICATION TO AT&T SITE. INSTALL ION-M23 SDARS (RRH) WITH RELATED EQUIPMENT ON ROOF. ALL IN CONFORMANCE WITH TPPN 5/98. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
AT&T - Replacement of existing telecommunications antennas with replacement of RRH units on roof and facade. Retrofit of existing cabinet in the existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.