8 total
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
CELLAR FOUNDATION WALL WATERPROOFING AND CELLAR CEILING SLAB & STEEL REPAIRS AS PER PLANS FILED HEREWITH NO CHANGE IN USE, EGRESS OR OCCUPANCY
Modification to existing VERIZON site on the roof. Installation of (2) microwave antennas.
HEREBY FILING FOR THE INSTALLATION OF CONCRETE PAD AND REPLACEMENT OF CHILLER. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.