Installation of 82.8 kw solar energy system on roof. No change of occupancy, use or egress.
EMERGENCY FACADE REPAIR WORK INCLUDE BRICK REPOINTIONG, TO REPLACE CRACKED BRICK, TO REPLACE DETERIORATED WINDOW SILLS AND LINTELS. WORKS TO CORRECT THE UNSAFE CONDITIONS IDENTIFIED IN CYCLE-9 FISP.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
MODIFICATION OF PLANTED AREAS, INCLUDING CONCRETE CURBING ADJACENT TO THE ENTRY TO MEDICAL SUITES A-1,A-2, A-3. REPLACE EXISTING MANUAL ENTRY DOORS WITH AUTOMATIC SLIDING DOORS.
CUTTING NEW OPENING (36'' W X 80 HIGH) IN EXISTING REINFORCED CONCRETE FOUNDATION WALL.