90-40 179 PLACE— Violations & Issues
Top Violations
Top 311 Complaints
§ 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE WASHBASIN AT WEST WALL IN THE BATHROOM LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 2NDFLO
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 2NDFLO
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 2NDFLO
§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 2NDFLO
§ 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE WATER SUPPLY PIPE AT WASH BASIN IN THE BATHROOM LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 2NDFLO
§ 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE WASH BASIN IN THE BATHROOM LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 2NDFLO
§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AND CLEANABLE, POSITIVE LEAD-BASED PAINT IN AN APARTMENT WITH A CHILD UNDER SIX LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 2
§ 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE AT BATHTUB IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 2
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL, SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 2
§ 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE FOYER LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 2