15 total
FIRE REHAB PERM RPR AT RF & FLS 1-6. INCL RF, PARTITION, DOORS & WDW RPL, FIRE DAMPER INSTALL, NEW FLOORS, CO/SMOKE DETECT., LIGHTG FXTS, MILLWRK & FINISHES. ASSOC ST WORK FILED SEP. NO CHGS TO EXTG APT LAYOUTS. NO CHG IN USE, EGRESS OR OCCUPANCY
STRUCTURAL FRAMING AND COLUMN REPAIRS ASSOCIATED WITH FIRE RESTORATION PERMANENT REPAIRS AT SOUTHEAST CORNER OF BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
EMERGENCY INSTALLATION OF TEMP SHORING & TEMP PRTN AT FLS CEL-6, TEMP ROOF ENCLOSURE, & REMOVAL OF WTR DAMG'D FINSHES DUE TO FIRE. IMMED WORK IS REQ'D FOR BLDG STABILIZATION, WEATHERPROOFING & TO SAFEGUARD OCCUPANTS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING DENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS AND OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING DENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS AND OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
EMERGENCY REPLACEMENT OF APTARTMENT FIRE RATED DOORS AT FLOORS 4-6 DUE TO FIRE ON PREMISES. IMMED INSTALLATION OF FIRE RATED DOORS IS REQ'D TO SAFEGUARD OCCUPANTS & CONDITIONS ON SITE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Facade repair includes pointing, brick replacement, caulking, replacement of window lintel & installation of waterproofing & replacement of window sills and lintels.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Facade repair includes pointing, brick replacement, caulking, replacement of window lintel & installation of waterproofing & replacement of window sills and lintels.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Replacement of existing Sanitary Fixtures as per plans. No change to use, egress or occupancy.