53-02 103 STREET— Violations & Issues
Top Violations
Top 311 Complaints
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2NDFLO, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
Apt: 2NDFLO
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2NDFLO, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
Apt: 2NDFLO
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFLO, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
Apt: 2NDFLO
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 1 SQ FT AT NORTH AND EAST WALLS IN THE BATHROOM LOCATED AT APT 2NDFLO, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 15724168 ISSUED 15-FEB-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
Apt: 2NDFLO
§ 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS OF LOWER SASH OF SOUTH WINDOW IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2NDFLO, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
Apt: 2NDFLO
§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFLO, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
Apt: 2NDFLO
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 1 SQ FT AT NORTH AND EAST WALLS IN THE BATHROOM LOCATED AT APT 2NDFLO, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
Apt: 2NDFLO