52-06 103 STREET is a new-construction 2013 building, 2 units in Corona, NYC. Owned by HU, XIAOXUAN. Public records show 3 open violations, 7 311 complaints, 1 active litigation matter on file. Tenant-impact history includes 1 eviction.
Drop this scorecard into a tenant guide, blog post, or wiki. It updates itself as new violations are filed.
Queens · February 2026
Best & worst months to sign a lease
Potential savings: ~12% by timing your move to August.
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
Monthly counts over the last 7 years · all data sources
§ 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHENETTE LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
§ 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Portfolio-level grade reflects the landlord's buildings across NYC, weighted by unit count. Individual building grades may differ.
View full landlord profileACRIS deeds and regulatory filings
Corona is the soul of immigrant Queens — the area around 103rd Street-Corona Plaza is a bustling Latin American market district, with tacos, pupusas, and tamales sold from carts and storefronts. Flushing Meadows-Corona Park (home of the Unisphere and Citi Field) provides grand green space.
Eviction Executed — Apt unknown — Possession
WATER LEAK — HEAVY FLOW
Plumbing — Gas Hook-Up/Piping - Illegal Or Defective
General Construction/Plumbing — Failure to Comply with Vacate Order
General Construction/Plumbing — Egress - Doors Locked/Blocked/Improper/No Secondary Means
Plumbing — Gas Hook-Up/Piping - Illegal Or Defective
APPLIANCE — ELECTRIC/GAS RANGE
SAFETY — CARBON MONOXIDE DETECTOR
HEAT/HOT WATER — APARTMENT ONLY
SAFETY — SMOKE DETECTOR