48-05 46TH ST— Violations & Issues
Top Violations
Top 311 Complaints
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE KITCHEN LOCATED AT APT APT2B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: APT2B
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT APT2B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: APT2B
§ 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 5B
§ 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .. IN THE ENTIRE APARTMENT LOCATED AT APT 1G
Apt: 1G
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST AT SOUTH, THE 2nd ROOM FROM EAST AT NORTH, THE 2nd ROOM FROM EAST AT SOUTH, THE KITCHEN LOCATED AT APT 4A, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
Apt: 4A
§ 27-2056.4 ADM CODE- Correct failure to notify occupants and/or to investigate lead-based paint hazards.