40-07 67 STREET— Violations & Issues
Top Violations
Top 311 Complaints
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT EAST WALL, BASEBOARD AT WEST WALL, WEST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
Apt: 1
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE KITCHEN , THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
Apt: 1
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, NORTH WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
Apt: 1
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2). BASEBOARD AT NORTH WALL, SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
Apt: 1
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT EAST WALL, BASEBOARD AT WEST WALL, WEST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
Apt: 1
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE AND EITHER TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 OR TESTED POSITIVE FOR LEAD CONTENT ON A METAL OR CERAMIC SUBSTRATE AS SET FORTH IN (28 RCNY §11-07(b)) USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2). BASEBOARD AT NORTH WALL, SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
Apt: 1
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK WORK AND POINTING SOUTH EXTERIOR WALL , 5th STORY
§ 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 21, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 21
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 21, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Apt: 21
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 21, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Apt: 21