Back to building

25-26 127 STREET— Violations & Issues

Loading chart data...

Top Violations

Pest Infestation5
Paint/Plaster5
Door/Lock3
Mold/Mildew2
Flooring1

Top 311 Complaints

Sewer9
Blocked Driveway7
HEAT/HOT WATER5
UNSANITARY CONDITION3
Abandoned Vehicle3
Class B - HazardousNOV SENT OUT

§ 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE LINE AT WASH BASIN IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 2

Jun 12, 2026
Class B - HazardousNOV SENT OUT

HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 2

Jun 12, 2026
Class B - HazardousNOV SENT OUT

§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT EAST AND SOUTH WALLS IN THE 4th ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 2

Jun 12, 2026
Class B - HazardousNOV SENT OUT

§ 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE LINE AT SINK IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 2

Jun 12, 2026
Class B - HazardousNOV SENT OUT

§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AT SHOWER BASE WALLS IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 2

Jun 12, 2026
Class B - HazardousNOV SENT OUT

§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING FRONT ENTRANCE TO EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 2

Jun 12, 2026
Class B - HazardousNOV SENT OUT

§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT SOUTH AND EAST WALLS IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 2

Jun 12, 2026
Class B - HazardousNOV SENT OUT

§ 27-2026 ADMIN. CODE: REPLACE THE BROKEN OR DEFECTIVE WASH BASIN IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 2

Jun 12, 2026
Class B - HazardousNOV SENT OUT

§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 2

Jun 12, 2026
Class B - HazardousNOV SENT OUT

§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT WEST AND NORTH WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 2

Jun 12, 2026
1–10 of 29
page 1 / 3
Advertisement