16 total
INSTALLATION OF AIR COOLED CHILLER AND COOLING TOWER.. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
RENOVATION OF EXISTING APARTMENT #2E IN SECOND FLOOR WITH GENERAL CONSTRUCTION: REPAINTING WALL, CEILING AND RESURFACE FLOOR AS PER PLAN;NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Replacing existing dual fuel burner with new to existing boiler in the cellar.
A FACADE RESTORATION PROJECT CONSISTING OF MASONRY REPLACEMENT, MASONRY REPOINTING,WINDOW SILL REPLACEMENT, WINDOW LINTEL REPLACEMENTAS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
A FACADE RESTORATION PROJECT CONSISTING OF MASONRY REPLACEMENT, MASONRY REPOINTING, WINDOW SILL REPLACEMENT, WINDOW LINTEL REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
proposed installation of a temporary sidewalk shed as per plans submitted. Work shall comply with 2014 building codes, chapter 33. No change in use, egress or occupancy.
A FACADE RESTORATION PROJECT CONSISTING OF MASONRY REPLACEMENT, MASONRY REPOINTING,WINDOW SILL REPLACEMENT, WINDOW LINTEL REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
A FACADE RESTORATION PROJECT CONSISTING OF MASONRY REPLACEMENT, MASONRY REPOINTING, WINDOW SILL REPLACEMENT, WINDOW LINTEL REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Proposed installation of a temporary sidewalk shed as per plans submitted. Work shall comply with 2014 building codes, chapter 33.No change in use, egress or occupancy.
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2014 building codes, chapter 33. no changes in use, egress or occupancy.
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Proposed installation of a temporary sidewalk shed as per plans submitted. Work shall comply with 2014 building codes, chapter 33. No change in use, egress or occupancy.
A FACADE RESTORATION PROJECT CONSISTING OF MASONRY REPLACEMENT, MASONRY REPOINTING, WINDOW SILL REPLACEMENT, WINDOW LINTEL REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Install NEW DEP antenna site. Install (2) antennas on bulkhead facade. Install (1) DCU cabinet on roof at bulkhead facade and (1) related solar panel on bulkhead facade. No change in use, egress or occupancy.
NEW KITCHEN RENOVATION OF EXIST'G APARTMENT. NO CHANGE IN USE, OCCUPANCY OR EGRESS IS INVOLVED UNDER THIS APPLICATION. *ALL GENERAL CONSTRUCTION WORK WAS FILED UNDER ALT-1#421917910
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.