114 total · Page 1 of 6
FACADE RESTORATION AT BUILDING 16. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF NEW SIDEWALK SHED AT 168-10 127 AVENUE, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PLUMBING WORK FOR TAKE-OUT RESTAURANT
PLUMBING WORK FOR DINE-IN RESTAURANT
INTERIOR RENOVATIONS WORK TO INCLUDE CEILING MODIFICATIONS AND FINISHES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
PLUMBING WORK ASSOCIATE WITH INTERIOR RENOVATION OF AN EXISTING SUPERMARKET. INSTALL NEW PLUMBING FIXTURES AS INDICATED ON PLANS AND ASSOCIATED SANITARY, DOMESTIC WATER PIPING. EXISTING WATER HEATER AND MAIN SANITARY TO REMAIN.
INSTALLATION OF NEW SIDEWALK SHED AT 163-35 130 AVENUE, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Cap and remove 1 toilets, 1 lavatory 1 urinal and 1 gas stove including piping. relocating 1 non residential sink, 2 toilet and 2 lavatory new fixtures on relocated piping and installing 2 new floor drains including associated piping as per plan
Cap and remove 1 toilet, 1 urinal, 1 lavatory and 1 gas stove and piping. relocating 2 toilets 2 lavatory and 1 non residential sink and associated piping. Installing 2 new floor drains and new piping as per plan
FILING TO CAP AND REMOVE 1 TOILET, 1 LAVATORY, 1 URINAL, AND 1 GAS STOVE AND ASSOCIATED PIPING , RELOCATE 2 TOILETS, 2 LAVATORIES, 1 NON RESIDENTIAL SINK, AND INSTALL 2 NEW FLOOR DRAINS AT BASEMENT LEVEL CLUBHOUSE # 14
capping and removing 1 urinal, 1 utility sink and 1 gas stove including piping . Relocate 2 toilets, 2 lavatory and 1 non residential sink and associated piping. Replace 1 toilet and 1 lavatory with new on existing piping. installing 2 new floor drains
plumbing work to include cap and remove 1 toilet 1 urinial, 1 lavatory and 1 gas stove relocate lines for 1 non residential sink, 2 toilets, 2 lavatory new fixtures to be installed on relocated lines, installing 2 new floor drains at clubhouse # 1
Cap and remove 1 toilets 1 lavatory 1 urinial and 1 gas stove including piping . Relocate 1 non residential sink 2 Toilets 2 lavatory and install 2 new floor drains at ADA bathroom. Including all associated piping as per plan
Renewal of SR23/2297
Renewal of sr 23/2299
Renewal of SR 23/2301