Back to building

141-26 85 ROAD— Violations & Issues

Loading chart data...

Top Violations

Heat/Hot Water4
Paint/Plaster2
Water Leak1

Top 311 Complaints

HEAT/HOT WATER5
PLUMBING4
WATER LEAK3
PAINT/PLASTER2
UNSANITARY CONDITION2
Class B - HazardousNOV SENT OUT

§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 1STFL , 1st STORY, 1st APARTMENT FROM EAST AT SOUTH

Apt: 1STFL

Apr 5, 2026
Class C - Immediately HazardousNOV SENT OUT

§ 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT SHOWER STALL IN THE BATHROOM LOCATED AT APT 1STFL , 1st STORY, 1st APARTMENT FROM EAST AT SOUTH

Apt: 1STFL

Apr 5, 2026
Class C - Immediately HazardousNOV SENT OUT

§ 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF HOT WATER TEMPERATURE EXCEEDS THE ALLOWABLE MAXIMUM OF 130 DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 1STFL , 1st STORY, 1st APARTMENT FROM EAST AT SOUTH

Apt: 1STFL

Apr 5, 2026
Class C - Immediately HazardousNOV SENT OUT

§ 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER EXCEED 130 DGREES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 1

Jan 12, 2026
Class B - HazardousNOV SENT OUT

§ 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT SHOWER STALL IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 1

Jan 12, 2026
Class C - Immediately HazardousNOV SENT OUT

§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 1

Dec 14, 2025
Class A - Non-HazardousNOV SENT OUT

§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 1

Dec 14, 2025
Advertisement