139-09 34TH RD
Similar buildings nearby.
Embed this building’s record
Drop this scorecard into a tenant guide, blog post, or wiki. It updates itself as new violations are filed.
Drop this scorecard into a tenant guide, blog post, or wiki. It updates itself as new violations are filed.
Queens · February 2026
Best & worst months to sign a lease
Potential savings: ~15% by timing your move to February.
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
Monthly counts over the last 7 years · all data sources
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS AT PUBLIC HALL, 4th STORY, SECTION ''B''
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE 2nd ROOM FROM EAST LOCATED AT APT B12, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''B'', AT WEST
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT B12, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''B'', AT WEST
§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT B12, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''B'', AT WEST
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE BATHROOM LOCATED AT APT D11, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D''
Downtown Flushing is the largest Chinatown outside of Asia — the food is extraordinary, the energy is electric, and the streets are packed at all hours. The New World Mall food court, the temples on Bowne Street, and the bustling Main Street corridor make this one of NYC's most vibrant neighborhoods.
HPD Class B Violation — § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS
HPD Class B Violation — § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEV
HPD Class A Violation — § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS
HPD Class A Violation — § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS AT PUBLIC
PAINT/PLASTER — CEILING
HEAT/HOT WATER — ENTIRE BUILDING
HPD Class A Violation — § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FEET AT EAST WALL I
HPD Class C Violation — § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER WINDOW SASH COUNTER BALANCE AT EAST WALL AT PUBL
HPD Class A Violation — § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM FROM BUILDING ENTRANCE TO NORTH WALL IN THE P
HPD Class A Violation — § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST WINDOW STOOL IN THE 3rd RO