10 total
CONNECT TO EXISTING GAS PIPING FOR ONE (1) REPLACEMENT GAS-FIRED BOILER AS PER PLANS. CAP/REMOVE GAS PIPING TO (1) REMOVED GAS-FIRED BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
REPLACE (2) DIRECT VENT GAS BOILERS (NYC BOILER MD 42636-03 AND MD 200119-04) WITH ONE (1) DIRECT VENT GAS BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
REPAIR AND REPLACE EXHAUST VENTS FOR DIRECT VENT GAS-FIRED BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
CONNECT TO EXISTING GAS PIPING FOR THREE (3) REPLACEMENT GAS-FIRED BOILERS. INSTALL TWO (2) INDIRECT STORAGE TANKS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
REPLACE ONE (1) BOILER AND GAS BURNER, TWO (2) GAS-FIRED BOILERS AND ONE (1) HOT WATER STORAGE TANK WITH THREE (3) DIRECT VENT GAS-FIRED BOILERS AND TWO (2) INDIRECT STORAGE TANKS. INSTALL NEW BUFFER TANK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Chimney repair as per plans; no change to use, egress, or occupancy.
Chimney repair as per plans; no change to use, egress, or occupancy.
Chimney repair as per plans; no change to use, egress, or occupancy.
Install new boilers to replace existing boilers and associated piping as per plan. Install new recirculation pumps and domestic indirect water heaters and associated piping to replace existing as per plan.
Install new gas piping to new boilers as per plan to replace existing. Approximately 20 feet of gas piping.