Back to building

134-10 FRANKLIN AVENUE— Violations & Issues

Loading chart data...

Top Violations

Paint/Plaster2
Mold/Mildew1

Top 311 Complaints

HEAT/HOT WATER27
UNSANITARY CONDITION10
PAINT/PLASTER8
APPLIANCE4
PLUMBING4
Class A - Non-HazardousVIOLATION DISMISSED

§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2 SQ FT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 5T, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH

Apt: 5T

Jan 14, 2021
Class C - Immediately HazardousVIOLATION CLOSED

§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH

Apt: 1B

Dec 16, 2020
Class C - Immediately HazardousVIOLATION CLOSED

§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH

Apt: 5B

Jun 8, 2019
Advertisement