108 total · Page 1 of 6
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO MAINTAIN A/CS. ON 5/5/13, AN UNSAFE NOTICES FISP3 DOCUMENT WAS SUBMITTED TO FLSP/DOB UNIT BY ANTHONY STASIO, P.E. STATING BUILDING TENANTS HAD INSTALLED WINDOW-MOUNTED A/CS IN A NON-COMPLIANT MANNER. THE A/CS ARE TO BE INSTALLED PER MANUFACTURERS INSTRUCTION AN BUILDING OWNER REQUIREMENTS. DOB CONTROL NUMBER 275015
FAILURE TO MAINTAIN A/CS. ON 5/5/13, AN UNSAFE NOTICES FISP3 DOCUMENT WAS SUBMITTED TO FLSP/DOB UNIT BY ANTHONY STASIO, P.E. STATING BUILDING TENANTS HAD INSTALLED WINDOW-MOUNTED A/CS IN A NON-COMPLIANT MANNER. THE A/CS ARE TO BE INSTALLED PER MANUFACTURERS INSTRUCTION AN BUILDING OWNER REQUIREMENTS. DOB CONTROL NUMBER 275015