22 total · Page 1 of 2
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
ENGINEERS REPORT REQUESTED DUE TO BALCONY AT EXPOSURE # 1 LEANING AT TIME OF INSPECTION OBSERVED A DAMAGE BALCONY WITH MISSING ROOF AND DAM AGES THROUGHOUT. ALSO NOTICE BALCONY WAS MISSING STRUCTURE AT RIGHTSID E. AN ENGINNER'S REORT IS NEEDED TO ASSESS AND RECTIFY THE STRUCTURAL INSTABILITY . REMEDY. OWNER TO HIRE NYSPE TO SUBMIT TO ERT ISNPECTIONS
FAILURE TO MAINTAIN.ENCLOSED FRNT PRCH LEANING TWRDS EXP2(SOUTH)MSSNG POST C EXP1/2 (SOUTHEAST)CRNR.POST UNSUPPORTD@EXP4(SOUTH)SIDE OF FRNT WALL OF PORCH&EXP4 WALL MSSNG ALONG W/PORTION OF EXP1.1.IMMED RPAIR FRNT PRCH UNDR PRMT AS PER NYSPE STRCTRL ENG,2.FILE FOR RPAIRS BY 2/10/25,3.OBTN PRMTS&STRT WRK BY 2/24/25
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
PLACE A FIRE GUARD IN THE BUILDING AROUND THE CLOCK ,UNTIL THE SPRINKLER SYSTEM IS BACK OPERATIONAL IN ORDER TO SAFEGUARD THE BUILDING OCCUPANTS