Back to buildingAug 20, 2024Aug 20, 2024Aug 20, 2024Aug 20, 2024
113-17 95 AVENUE— Violations & Issues
Loading chart data...
Top Violations
Water Leak2
Paint/Plaster2
Top 311 Complaints
Blocked Driveway22
Illegal Parking10
Dirty Condition1
Noise - Residential1
UNSANITARY CONDITION1
Class B - HazardousVIOLATION DISMISSED
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 1FLR, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 1FLR
Class B - HazardousVIOLATION DISMISSED
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING AND EAST WALL AT VESTIBULE AT PUBLIC HALL, 1st STORY
Class B - HazardousVIOLATION DISMISSED
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AND EAST WALL AT VESTIBULE AT PUBLIC HALL, 1st STORY
Class B - HazardousVIOLATION DISMISSED
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT EAST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 1FLR, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 1FLR