112-21 GUY R BREWER BLVD
Similar buildings nearby.
Embed this building’s record
Drop this scorecard into a tenant guide, blog post, or wiki. It updates itself as new violations are filed.
Drop this scorecard into a tenant guide, blog post, or wiki. It updates itself as new violations are filed.
Queens · February 2026
Best & worst months to sign a lease
Potential savings: ~28% by timing your move to March.
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
Monthly counts over the last 7 years · all data sources
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT EAST WINDOW FRAME IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT NORTH WINDOW FRAME IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 10 SQ FT AT NORTH WALL BASE BOARD IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WINDOW FRAME IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Portfolio-level grade reflects the landlord's buildings across NYC, weighted by unit count. Individual building grades may differ.
View full landlord profileTop 1 by score · of 3 total
ACRIS deeds and regulatory filings
South Jamaica is a residential neighborhood with a strong Black and Caribbean community, anchored by York College and the surrounding blocks of modest homes and garden apartments. The area is affordable and community-oriented, though it has historically been underserved.
HPD Class B Violation — HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1F, 1st STO
HPD Class A Violation — § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT EAST WINDOW F
HPD Class A Violation — § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT NORTH WINDOW
HPD Class B Violation — § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 10 SQ FT AT NORTH WALL BASE
HPD Class B Violation — § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WINDOW FRAME IN THE 2nd R
HPD Class A Violation — § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN
HPD Class B Violation — § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT EAST WINDOW FRAME
HPD Class B Violation — § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BAT
HPD Class C Violation — § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE UPPER AND LOWER SASH COUNTERBALANCE AT THE EAST WINDOW IN THE