Back to building

107-18 LIBERTY AVENUE— Violations & Issues

Loading chart data...

Top Violations

Paint/Plaster10
Water Leak3
Roof/Ceiling2
Door/Lock1
Heat/Hot Water1

Top 311 Complaints

Request Large Bulky Item Collection8
HEAT/HOT WATER4
Noise - Street/Sidewalk3
Missed Collection3
Noise - Vehicle3
Class C - Immediately HazardousVIOLATION CLOSED

§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH

Apt: 1

Nov 20, 2024
Class C - Immediately HazardousVIOLATION CLOSED

§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, SOUTH WALL, WEST WALL IN THE KITCHEN LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH

Apt: 1

Nov 20, 2024
Class C - Immediately HazardousVIOLATION CLOSED

§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE ENTRANCE LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH

Apt: 1

Nov 20, 2024
Class C - Immediately HazardousVIOLATION CLOSED

§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH

Apt: 1

Nov 20, 2024
Class C - Immediately HazardousFIRST NO ACCESS TO RE- INSPECT VIOLATION

§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH

Apt: 1

Nov 20, 2024
Class C - Immediately HazardousVIOLATION CLOSED

§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL, SOUTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH

Apt: 1

Nov 20, 2024
Class C - Immediately HazardousVIOLATION CLOSED

§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH

Apt: 1

Nov 20, 2024
Class C - Immediately HazardousVIOLATION CLOSED

§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL, WEST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH

Apt: 1

Nov 20, 2024
Class C - Immediately HazardousCERTIFICATION POSTPONMENT GRANTED

§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE PRESUMED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AND CLEANABLE, PRESUMED LEAD PAINT IN AN APARTMENT WITH A CHILD UNDER SIX LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH

Apt: 1

Nov 20, 2024
Class I - InfoINFO NOV SENT OUT

§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.

Nov 18, 2024
1–10 of 21
page 1 / 3
Advertisement